Models:
Green Shelter 1 | Nano Cool Green Shelter | Green Shelter 2
   

Green Shelter 1
ACME’s Green Shelter houses the BTS and electronic equipment. It comes fitted with PIU, PCM and efficient AC systems, providing 4 to12 hrs of thermal backup, which reduces energy costs per site.

The Green Shelter’s Fiber Reinforced Plastic (FRP) outer skin provides greater insulation, is longer lasting and offers better thermal resistance to solar gain than conventional shelters.

ACME provides general operations and maintenance support, including the provision of maintenance staff, mobile distributed generation facilities, emergency storage, processing the payment of customers' monthly electric bills, etc.

Benefits are widely accepted and Bharti Telecom is the user of this product in most of their sites today.

 
Key Advantages
Higher insulation leading to lower solar gain, hence lower air conditioning requirements and reduced energy costs
Rust-free, thus suitable for tropical conditions
FRP coating ensures minimal repainting
Modular design facilitating faster deployment
Expandable to accommodate future needs
  
Product Innovation
GS II & GS III are an extension of the ‘Green Shelter Concept’ pioneered by ACME and a result of months of testing & research work carried out by the dedicated R&D Teams at the Manesar facility. The latest offering in this field i.e., GS III was a result of over 2500 manhours of extensive & concentrated R&D effort, in furtherance to the ‘Green Cause’. It’s worth noting here that the use of wood is completely avoided in the making of the Green Shelter & even the flooring is also made up of the special recycled plastics known as eco-flooring.
 
© copyright 2007, Acme Tele Power Ltd. careers . feedback . contact    |    site by: cross section